Project typeRenovation
Street and townWoods Road, Pinehurst, NC (Moore County)
Photo datesApril to October
Main workDemo to the studs, a gutted bathroom, a new kitchen with white cabinets and open shelves, two tiled showers with glass doors, refinished floors and bedrooms
The transformation story

Open to the studs in April, move-in ready by October

When we started, several rooms were open to the studs. One bathroom was gutted down to the studs and subfloor. The wall beside the brick fireplace was opened up too. By October, the kitchen, showers, floors and bedrooms were completed.

What we found

What we found at the start

Rooms open to the studs

The problemThe main rooms were open to the studs.
How we handled itWe closed the walls and completed each room.
Why it matteredStarting from the studs let every room start fresh, wall to wall.

A gutted bathroom

The problemOne bathroom was down to the studs and subfloor.
How we handled itWe built it back with a tiled walk-in shower and a glass door.
Why it matteredRebuilding from the studs gave the bath a fresh start.

Worn floors

The problemThe floors were worn when the job started.
How we handled itWe refinished them through the kitchen, dining and living areas.
Why it matteredRefinished floors tie the rooms together.
What we did

By room and system

Kitchen

  • White cabinets and a deep white sink under the window.
  • Open wood shelves on a tiled wall.
  • Recessed lights across the ceiling.

Bathrooms

  • Two tiled showers with glass doors.
  • A walk-in shower with a built-in bench.

Living room

  • The brick fireplace stayed as the center of the room.
  • The wall around it was opened during demo, then closed again.

Floors

  • Floors refinished through the kitchen, dining and living areas.

Bedrooms

  • Bedrooms completed with fresh paint, recessed lights and a ceiling fan.
  • One bedroom has built-in shelves.

The exterior today

  • The front of the house is blue today, with white trim and shutters.
  • A covered front porch and a brick walk lead to the door.
Then and now

Before and after, room by room

BeforeBrick fireplace with the wall around it opened to the framing before a full home renovation in Pinehurst NC
AfterLiving room with exposed brick fireplace and mounted TV after a full home renovation in Pinehurst NC
Living room fireplace
BeforeKitchen sink wall before the renovation in Pinehurst NC, stripped to old paneling with the plumbing stubbed out under the window
AfterKitchen sink wall with open wood shelves on a tiled wall after a full home renovation in Pinehurst NC
Kitchen sink wall
BeforeKitchen and dining area before the renovation in Pinehurst NC, with worn subfloor and the old counter wall stripped
AfterKitchen counter and dining table with open wood shelves after a full home renovation in Pinehurst NC
Kitchen and dining corner
BeforeBathroom before the renovation in Pinehurst NC, gutted to the studs with the toilet and window on the back wall
AfterBathroom with a white vanity, black fixtures and a glass shower door after a full home renovation in Pinehurst NC
Bathroom
DuringBedroom with built-in shelves during the renovation in Pinehurst NC
AfterBedroom with twin beds and built-in wall shelves after a full home renovation in Pinehurst NC
Bedroom with built-in shelves
Project phases

How the job ran

  1. Demo, April. Walls opened to the studs and one bathroom gutted.
  2. Kitchen install, early October. Cabinets, sink and open shelves set in place.
  3. Completed rooms, October. Kitchen, showers, floors and bedrooms done.
Results

The house today

  • A new kitchen with white cabinets, open shelves and recessed lights.
  • Two tiled showers with glass doors.
  • Refinished floors through the main rooms.
  • A brick fireplace at the center of the living room.
  • Bedrooms with fresh paint.
FAQ

Questions about the Woods Road renovation

What work did Red Wolf do on the Woods Road renovation in Pinehurst?

Red Wolf Roofing & Construction renovated the Woods Road house in Pinehurst, NC. We opened rooms to the studs, gutted a bathroom and built the house back. The completed work includes a new kitchen, two tiled showers, refinished floors and bedrooms.

What did the house look like when the job started?

Photos from April show walls open to the studs and worn floors. One bathroom was gutted down to the subfloor. The wall around the brick fireplace was open too.

Did the brick fireplace stay?

Yes. The brick fireplace stayed and is the center of the living room today. The wall around it was opened during demo and then closed again.

Can Red Wolf take on a full home renovation in Pinehurst?

Yes. We are a licensed residential general contractor in North Carolina, License #107188. Red Wolf Roofing & Construction has over ten years of construction and remodeling experience. Call (910) 420-0988 to set up a walkthrough.

Ready to start?

Planning a renovation in Pinehurst?

See our Pinehurst page for the roofing side of our work in town. Red Wolf Roofing & Construction handles kitchens, baths and full home renovations across Moore County. We are a licensed residential general contractor in North Carolina, License #107188. Red Wolf Roofing & Construction has over ten years of construction and remodeling experience. Our phone team answers 24/7. Call (910) 420-0988 to set up a walkthrough. Our office is at 105 Bradford Village Ct, Southern Pines NC 28387.